Workshopshed4
Workshop Walls

Once the tiling was finished, I took a bit of a break for the summer before starting on the walls. The walls are multi-layered and my main concern was getting the building water tight before winter hits, so the outer
Wall framing and Door

The roof tiling for the new Workshop was completed last month and had proven to work well in both hot and rainy weather. I then took a break from building for EMF Camp and for a family vacation. The next
Tiling a shed roof

Roof pitch, life expectancy and price all factored into the selection of the right tiles. Ease of installation was a bonus.
Roof works

Earlier in the month when I had my strong helper, I commented that it was more important to get the boards on the roof than it was it get it perfect.
Footings and framing

Although some timber-framed buildings simply rest on their foundations, I wanted mine to be fixed down. We do get some very high winds around here and we’ve already lost a small greenhouse and I also don’t want the weather driving



Metal sculpture in brass, mounted on an 1800s French Coin




